Notes from systems that survived production.

articles
03
topics
03

/articles [3]

POSTMORTEMS

We Logged Success. Nothing Had Actually Landed.

An EHR integration logged successful writes that never landed. A mismatched error field and a stale note ID exposed why success needs positive evidence. 4 min read

AI ENGINEERING

The Model Was Following the Prompt. That Was the Problem.

Duplicate orders looked like an LLM failure. The model was following the prompt—the problem was that the prompt and architecture did not represent the product’s states clearly enough. 4 min read

BUILD LOG

Welcome to Built in Production

An introduction to Built in Production and the practical engineering stories it aims to document. 5 min read