Engineering stories from production.

status
shipping
stories
03
latest
oct 15

/stories [3]

  1. We Logged Success. Nothing Had Actually Landed.

    An EHR integration logged successful writes that never landed. A mismatched error field and a stale note ID exposed why success needs positive evidence.

    →
  2. The Model Was Following the Prompt. That Was the Problem.

    Duplicate orders looked like an LLM failure. The model was following the prompt—the problem was that the prompt and architecture did not represent the product’s states clearly enough.

    →
  3. Welcome to Built in Production

    An introduction to Built in Production and the practical engineering stories it aims to document.

    →